Client

Asian Supply Base

Location

Tanjong Pagar, Keppel Brani Terminal

Construction Period

October 2012 – July 2013 (9 mths)

Scope of Works

Maintenance Dredging

Dredging and Disposal

20,000 m³

The Asian Supply Base plays a critical role in the Maintenance Dredging project at the Tanjong Pagar, Keppel, and Brani Terminal Defined Area in Singapore. This project is essential for the maintenance and preservation of navigational channels, ensuring safe and efficient vessel traffic.

Project Details:

  • Location: The project site is situated within the Tanjong Pagar, Keppel, and Brani Terminal Defined Area in Singapore, which are pivotal hubs for maritime commerce and trade.

  • Scope: The primary focus of this project is maintenance dredging, a vital operation that involves the precise removal of accumulated sediment and debris from the waterways, thereby guaranteeing safe and smooth vessel navigation.

Quantitative Highlights:

  • Dredging and Disposal: Approximately 20,000 cubic meters of sediment and debris are diligently dredged from the waterways and responsibly disposed of, ensuring unobstructed navigational access.

Construction Period: The project commenced in October 2012 and concluded successfully in July 2013, spanning nine months. This timeline emphasizes the meticulous planning and execution required for effective maintenance dredging operations.

Asian Supply Base’s involvement in this initiative showcases their commitment to maintaining the accessibility and functionality of Singapore’s critical maritime infrastructure. Through the implementation of maintenance dredging, the project actively contributes to the continued success of these terminals in facilitating regional and global trade.