Client

MRCB Environmental Services Sdn. Bhd.

Location

Tanjong Pagar, Keppel Brani Terminal

Construction Period

October 2012 – July 2013 (9 mths)

Scope of Works

Maintenance Dredging

Dredging and Disposal

20,000 m³

Project Spotlight: Maintenance Dredging for Enhanced Maritime Accessibility

Project Overview: YTC Construction played a pivotal role in ensuring the uninterrupted flow of maritime traffic by executing maintenance dredging in the defined area of Tanjong Pagar, Keppel, and Brani Terminal, Singapore. This project highlights our commitment to preserving safe navigation channels.

Key Project Details:

  • Location: Tanjong Pagar, Keppel, and Brani Terminal, Singapore
  • Scope: Maintenance Dredging, a critical operation to maintain suitable water depths for maritime vessels.
  • Dredging and Disposal: Approximately 20,000 cubic meters of sediment were carefully dredged and disposed of in accordance with environmental standards.
  • Construction Period: From October 2012 to July 2013, this project was executed within a dedicated timeframe of 9 months.

This project underscores our dedication to supporting maritime accessibility, ensuring the continued smooth flow of goods and trade through Singapore’s essential terminals. YTC Construction remains committed to excellence in marine maintenance, contributing to the efficiency of the region’s maritime operations.